kakranan public tenders
kakranan, tripura
- construction of road from 1. ls25-udaipur kakraban tulamura main road to tribal para, block- kakraban (length-1.10 km) package no- tr-06-93 p5. 2. l502-salgarahkishoreganj road to char para, block- kakraban (length-1.13 km) package no tr-06-70 ps. 3. ls03-salgarah kishoreganj road to purba para, block- kakraban (length-0.75 km) package no tr-06-7i ps. 4. l504-shalgarah uttarpara a wc pwd road to paschim para, block- kakraban (length-1.675 km) package no- tr-06-72 ps. s. ls05-shalgarah kishoregan
- Authority : Public Works Department
- Deadline : 27 Aug 2026
- Value : 26.69 Crores
- Download
kakranan, tripura
- construction of road from 1. l 525-udaipur kakraban tulamura main road to tribal para, block- kakraban (length-1.10 km) package no- tr-06-93 p 5. 2. l 502-salgarahkishoreganj road to char para, block- kakraban (length-1.13 km) package no- tr-06-70 p 5. 3
- Authority : National Rural Infrastructure Development Agency
- Deadline : 27 Aug 2026
- Value : 26.69 Crores
- Download
kakranan, tripura
- construction of road from 1. l 525-udaipur kakraban tulamura main road to tribal para, block- kakraban (length-1.10 km) package no- tr-06-93 p 5. 2. l 502-salgarahkishoreganj road to char para, block- kakraban (length-1.13 km) package no- tr-06-70 p 5. 3
- Authority : National Rural Infrastructure Development Agency
- Deadline : 27 Aug 2026
- Value : 26.69 Crores
- Download
kakranan, tripura
- retrofitting of existing ge acbs with acb of other manufacturer at otpc palatana plant site
- Authority : Tripura Power Company Limited
- Deadline : 28 Aug 2026
- Value : Refer Document
- Download
kakranan, tripura
- modification and maintenance of bhel store 2 and 3 side area inside ongc tripura power company limited (otpc) palatana plant, tripura
- Authority : Tripura Power Company Limited
- Deadline : 26 Aug 2026
- Value : Refer Document
- Download
kakranan, tripura
- supply, installation, testing and commissioning of transformer online moisture removal system at ongc tripura power company limited (otpc) palatana plant, tripura.
- Authority : Tripura Power Company Limited
- Deadline : 18 Aug 2026
- Value : Refer Document
- Download
