guntur public tenders
guntur, andhra pradesh
- supply and delivery of ferric alum for the maintenance of head water works in guntur municipal corporation
- Authority : Municipal Corporation
- Deadline : 31 Oct 2026
- Value : 8.40 Lac
- Download
guntur, andhra pradesh
- providing interconnections between new di and hdpe pipelines and existing pipelines from srinagar 7/1 line to 7/7 lines in division no 69 under ae-12 section.
- Authority : Municipal Corporation
- Deadline : 06 Nov 2026
- Value : 4.17 Lac
- Download
guntur, andhra pradesh
- construction of 1 no s&t building for end goompty (ei) in connection with additional loop line and longer loop line at potlapadu station.
- Authority : South Coast Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- nallapadu-nandyal: extension of of rub -provision of additional loop line with junction type crossover facility and conversion of existing looplineas longer loop line at potlapadu station in gnt-ndl section
- Authority : South Coast Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- guntur division: proposed construction of rub in lieu of lc no 283 at km 44/19-20 between stur-nrt stations
- Authority : South Coast Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- provision of additional loop line with junction type crossover facility and conversion of existing loop line as longer loop line at potlapadu station in gnt-ndl section(track portion)
- Authority : South Coast Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- br no.412 at km 113/3-4 is proposed for extension of size 1x 6.10 m psc slab at poo station yard
- Authority : South Coast Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of dual-mode (hand-held & cms compatible), fuel-cell sensor based breath alcohol analyser with printer
- Authority : South Coast Railway
- Deadline : 20 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of edge ai gpu system nvidia jetson agx orin 32 gb for ai enabled drone based condition monitoring system (aicms)
- Authority : South Coast Railway
- Deadline : 20 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- door mats synthetic type blue/green of size 750 mmx 1460 mm.
- Authority : South Central Railway
- Deadline : 20 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of belt tensioning device assembly conforming to rdso drg. no. skel - 3940 sheet-i alt.5 and sheet-ii alt.5, suitable for 4.5 kw transom mounted brushless alternator
- Authority : South Coast Railway
- Deadline : 20 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of paper computer 2 ply 38.1 x 30.5 cms, 60 gsm conforming to is 12766/97 or latest.the indian railways logo to be printed on top left corner
- Authority : South Central Railway
- Deadline : 13 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of paint synthetic enamel
- Authority : South Central Railway
- Deadline : 12 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of paint enamel synthetic golden yellow finishing isc 356 to i.s:8662/2004 with rdso amendment no. 1 (rev. 0) for pigment content as an additional requirement to is: 8662-2004 w.e.f. 01.08.2016, and icf specn. no. icf/md/spec-045 issue-02 rev. no.0
- Authority : South Central Railway
- Deadline : 11 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of paint enamel, synthetic exterior finishing
- Authority : South Central Railway
- Deadline : 11 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- isi marked cord flexible pvc insulated with twin twisted annealed high conductivity copper wires conforming to is: 8130/1984 of size 0.50 sq.mm [16/0.20 mm] confirming to is: 694/1990[ third revision] with amendment 1 to 3 or latest, insulated of 1100 v g
- Authority : South Central Railway
- Deadline : 11 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of 18/20 w led (indoor) tube light fittings
- Authority : South Central Railway
- Deadline : 11 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of entrance hand rail complete. rcf drg.
- Authority : South Central Railway
- Deadline : 09 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of air intake filter air compressors
- Authority : All India Institute Of Medical Sciences
- Deadline : 06 Nov 2026
- Value : Refer Document
- Download
guntur, andhra pradesh
- supply of moisture filter air compressors
- Authority : All India Institute Of Medical Sciences
- Deadline : 06 Nov 2026
- Value : Refer Document
- Download
